Loading...
Loading...

Northwest WI Regional Construction Update

This week's construction update for our region from the Wisconsin Department of Transportation

Northwest WI Regional Construction Update

Northwest Region Construction Update

The Wisconsin Department of Transportation (WisDOT) provides weekly updates on road construction projects in the following counties in northwest Wisconsin: Ashland, Barron, Bayfield, Buffalo, Burnett, Chippewa, Clark, Douglas, Dunn, Eau Claire, Jackson, Pepin, Pierce, Polk, Rusk, St. Croix, Sawyer, Taylor, Trempealeau and Washburn counties.

Douglas County

Highway: US 2/53 (East 2nd Street)

Location: Between 29th Avenue East and 53rd Avenue East, city of Superior

Schedule: April 5 to October

Cost: $4.98 million

Description: Repairing spot locations of concrete pavement, resurfacing East 2nd Street by grinding the concrete surface and overlaying it with asphalt, replacing traffic signals at 39th Avenue East, rehabilitating the Nemadji River and Bluff Creek structures, upgrading and installing curb ramps at pedestrian crossings and making spot repairs to sidewalk panels.

Traffic impacts:

  • Traffic is reduced to a single lane in each direction.
  • The speed limit in the construction zone has been reduced to 25 mph.

Dunn and St. Croix counties

Highway: I-94

Location: Between Hudson and Menomonie near Knapp

Schedule: March 25, 2019 to May 2021

Cost: $57.5 million

Description: Removing and replacing concrete pavement and six structures, grading, marking pavement and installing beam guard, cable barrier, right-of-way fencing and signing.

Traffic impacts: There will be lane closures on east- and westbound I-94 from WIS 128 to 250th Street during non-peak travel hours.

Dunn and St. Croix counties

Highway: WIS 170

Location: Between WIS 128 in Glenwood City in St. Croix County and County D in the Dunn County town of Sherman

Schedule: April 12 to October

Cost: $8.63 million

Description: Milling the existing pavement on WIS 170 from WIS 128 to WIS 79 and overlaying it with asphalt; recycling the existing pavement from WIS 79 to County D and overlaying it with asphalt; reconstructing the intersection of WIS 170 and WIS 79 in Boyceville; rehabilitating the WIS 170 bridge over Tiffany Creek northwest of Downing; replacing or extending culvert pipes or equipping them with end walls; installing traffic signals at the WIS 170 and northbound WIS 79 intersection; increasing the width of paved shoulders along WIS 170 to a minimum of 3 feet; and replacing guardrail.

Traffic impacts:

  • Motorists can expect sporadic single-lane closures controlled by flaggers.
  • Temporary pedestrian accommodations are in place in Glenwood City.
  • Traffic will be controlled by temporary traffic signals for bridge work anticipated to start late next week.

Eau Claire County

Highway: County D

Location: Boardwalk Street in Fall Creek to County N in the town of Lincoln

Schedule: April 19 to July

Cost: $1.66 million

Description: Replacing the pavement, curbing, culverts and guardrail and overlaying a structure over Fall Creek and replacing its railing.

Traffic impacts: Motorists might encounter intermittent single-lane closures.

Pierce and St. Croix counties

Highway: WIS 29

Location: Between County CC South west of Spring Valley and WIS 128 in St. Croix County

Schedule: April 5 to July

Cost: $3.88 million

Description: Milling the existing asphalt, patching the road base and overlaying it with new asphalt; repairing and overlaying the Eau Galle River Bridge; repairing four box culverts in St. Croix County; replacing one culvert in Pierce County; and replacing a retaining wall in Spring Valley.

Traffic impacts:

  • WIS 29 is reduced to one lane of traffic during daytime hours at work sites throughout the project limits, with traffic controlled by flagging operations.
  • WIS 29 over the Eau Galle River Bridge is reduced to one lane at all times, with traffic controlled by temporary traffic signals.
  • Starting Monday, May 3, WIS 29 between County CC and WIS 128 will be detoured for approximately 24 days.
    • Detour route: County CC, County G, WIS 72 and WIS 128.

Trempealeau County

Highway: WIS 93

Location: Between Swenson Lane southeast of Arcadia to WIS 35/54 in Centerville

Schedule: April 12 to August.

Cost: $3.99 million

Description: Milling and overlaying the existing pavement between Swenson Lane and WIS 35/54, milling the existing pavement 100 feet east, west and south of the WIS 93/35/54 intersection, installing centerline rumble strips, repairing culverts and cleaning ditches as needed and replacing damaged or outdated guardrail.

Traffic impacts: Traffic is restricted to a single lane and controlled by flagging while crews work on culvert pipe replacements.

Washburn County

Highway: US 53

Location: Between Mackey and Ross roads in the town of Trego

Schedule: March 17, 2021 – November 2022

Cost: $17.65 million

Description: Reconstructing US 53 from Mackey Road to existing US 63, relocating US 63 to closely follow the existing Wild River State Trail and constructing a new grade separated interchange connecting US 53 with realigned US 63, new west frontage road from Mackey Road to County E and turn lanes along US 53 at existing intersections, including Mackey, O’Brien and Ross roads.

Traffic impacts: There will be occasional lane closures on US 53 and US 63 for the placement of temporary signals at the US 53 intersections at US 63 and County E.

Last Update: Apr 26, 2021 8:56 am CDT

Posted In

Outdoors

Share This Article

Loading...
Loading...
Loading...
Loading...